[Az-Geocaching] Adopt-A-Highway??

GREGG OBUCH listserv@azgeocaching.com
Sun, 22 Feb 2004 17:08:57 -0800 (PST)


--0-416995442-1077498537=:14557
Content-Type: text/plain; charset=us-ascii

Being from Tucson we probably won't be able to make all of the clean-up events, but will make as many as possible.  We would lean toward the main (first time event) being tied in with CITO day.  However, if there was an earlier clean-up event then on CITO day the actual clean-up shouldn't take long (less trash) and there would be more time for traditional event type activity.
 
MO & GO; Tucson

Brian Casteel <bcasteel1@cox.net> wrote:
Early on in the process, there was significant support for this to happen.  But so far, I've received only one response on how the first clean-up should be handled.  Has the interest cooled since the holidays?  I don't want to schedule clean-ups too close together (4 clean-ups required per year, which will be event caches), and there would be about 6 weeks between cleanups if we were to do one now and for CITO Day.
 
I'm getting ready to create the cache page with limited information to be updated as info becomes available.  
 
According to ADOT, the permit for this Adopt-A-Highway segment is in my name, but I really want decisions regarding clean-ups to be decided by the participating community.
 
Brian
Team A.I.

--0-416995442-1077498537=:14557
Content-Type: text/html; charset=us-ascii

<DIV>Being from Tucson we probably won't be able to make all of the clean-up events, but will make as many as possible.&nbsp; We would lean toward the main (first time event) being&nbsp;tied in with CITO day.&nbsp; However, if there was an earlier clean-up event then on CITO day the actual clean-up shouldn't take long (less trash) and there would be more time for traditional event type activity.</DIV>
<DIV>&nbsp;</DIV>
<DIV>MO &amp; GO; Tucson<BR><BR><B><I>Brian Casteel &lt;bcasteel1@cox.net&gt;</I></B> wrote:</DIV>
<BLOCKQUOTE class=replbq style="PADDING-LEFT: 5px; MARGIN-LEFT: 5px; BORDER-LEFT: #1010ff 2px solid">
<META content="MSHTML 6.00.2800.1400" name=GENERATOR>
<STYLE></STYLE>

<DIV><FONT face=Arial size=2>Early on in the process, there was significant support for this to happen.&nbsp; But so far, I've received only one response on how the first clean-up should be handled.&nbsp; Has the interest cooled since the holidays?&nbsp; I don't want to schedule clean-ups too close together (4 clean-ups required per year, which will be event caches), and there would be about 6 weeks between cleanups if we were to do one now and for CITO Day.</FONT></DIV>
<DIV><FONT face=Arial size=2></FONT>&nbsp;</DIV>
<DIV><FONT face=Arial size=2>I'm getting ready to create the cache page with limited information to be updated as info becomes available.&nbsp; </FONT></DIV>
<DIV><FONT face=Arial size=2></FONT>&nbsp;</DIV>
<DIV><FONT face=Arial size=2>According to ADOT, the permit for this Adopt-A-Highway segment is in my name, but I really want decisions regarding clean-ups to be decided by the participating community.</FONT></DIV>
<DIV><FONT face=Arial size=2></FONT>&nbsp;</DIV>
<DIV><FONT face=Arial size=2>Brian</FONT></DIV>
<DIV><FONT face=Arial size=2>Team A.I.</FONT></DIV></BLOCKQUOTE>
--0-416995442-1077498537=:14557--